Il Sole 24 Ore: Goccia di Carnia resumes production in record time thanks to PERINGENERATORS

Il Sole 24 Ore: Goccia di Carnia resumes production in record time thanks to PERINGENERATORS

Posted by on 8 Nov 2018 in Home, Press

Il Sole 24 Ore: Goccia di Carnia resumes production in record time thanks to PERINGENERATORS

Il Sole 24 Ore newspaper present the rapid intervention of PERINGENERATORS, in response to the electric emergency that hit Friuli Venezia-Giulia, has made possible the reopening of the Goccia di Carnia  bottled mineral water plant.

12540adc-4583-4511-a5f9-edb322ad8e57

The Italian company had to stop production for safety reasons. For the strong weather instability it had remained completely isolated, without electricity and without telephone.

PERINGENERATORS made the reopening of production possible, thanks to the installation of a 1MW generator set.

Here is the article of November 07 of newspaper Il sole 24 ore, which talks about the rapid intervention of PERINGENERATORS.

Stay up to date with the many installations of power generators and generating sets, in Italy and all around the world, by visiting the blog section dedicated to PERINGENERATORS new orders.