PERINGENERATORS saves the snow black out emergency in Alto Adige (ITALY)

PERINGENERATORS saves the snow black out emergency in Alto Adige (ITALY)

Posted by on 27 Nov 2019 in Home, New orders

PERINGENERATORS saves the snow black out emergency in Alto Adige (ITALY)

PERINGENERATORS satisfies, with rapid interventions, every energy need even in a dramatic situation like that of the Alto Adige area (ITALY), where many people are isolated and without electricity due to snow.

Many power generators left from the plants of PERINGENERATORS GROUP,  heading for areas affected by the snow black out emergency in Alto Adige.

Here are some generators delivered and installed at high altitude.

5f77a33b-67d0-4c2a-947f-e2647025beaf bc004729-c7ce-4b81-8bb2-7cabbc6e8b64

Stay up to date with the many installations of power generators and generating sets, in Italy and all around the world, by visiting the blog section dedicated to PERINGENERATORS GROUP new orders.