Loading operation: 1500 kW power pack ready to go!

Loading operation: 1500 kW power pack ready to go!

Posted by on 10 Apr 2020 in Home, New orders

Loading operation: 1500 kW power pack ready to go!

PERINGENERATORS  quickly covers every energy needs, with the production and sale of power generators, with different power levels, suitable for industrial use.

Here are loading operations of a 1,500 kW Power Pack ready to go!

IMG_3280

Stay up to date on the many installations of PERINGENERATORS GROUP, in Italy and all around the world,  by visiting the blog section dedicated to new orders.